Skip to content
07954 390 237
A driveway under construction with new brick edging laid and the base prepared

Access solutions

Driveways, Pathways and Slabs in London

Driveways, paths, block paving and concrete bases, laid by the same team that digs the ground out and builds what sits underneath.

How We Build a Driveway, From the Base Up

A driveway is built from the bottom up. The ground comes out to a depth that suits what the drive has to carry, the sub base goes in and is compacted in layers rather than one lift, and only then does anything you can see get laid. The digging and the base are our own work, not a subcontractor's. Skip that stage and a drive looks right for a year, then dips where the wheels sit.

Front gardens in England carry a planning rule worth knowing before you pick a surface. Paving over more than five square metres with something water cannot pass through normally needs permission, unless the run off goes to a border, a lawn or a soakaway on your own land, or the surface itself is permeable. Permeable paving and gravel usually sit outside it. Confirm the position with your council.

Water is the decision most people skip. A drive that falls towards the house instead of away from it will find the doorstep eventually, and a path laid flat will hold puddles at the low points. We set the falls before anything is laid, and we put in a channel drain, a linear gully or a soakaway where the water has nowhere else sensible to go.

Concrete bases are a different job again. A slab for a garage, a garden room, a hot tub or a piece of plant has to be thick enough, reinforced for the load and sat on a membrane so damp does not come up through it. A hot tub full of water and people weighs far more than the empty shell suggests, and a slab poured for a shed will not hold one.

If the drive needs a new dropped kerb, that is a crossover, and it is normally the local highway authority who has to agree it. What we can do is tell you what the council will be looking at, and get the drive built so the crossing works once the permission is in place.

What that includes

  • Excavation and sub base to the right depth
  • Block paving, flags and natural stone
  • Reinforced concrete slabs and bases
  • Concrete, tarmac and resin driveways
  • Edging, kerbs and mowing strips
  • Falls set and drainage put in
  • Permeable options for front gardens
  • Steps, thresholds and level changes
A driveway under construction with new brick edging laid and the base prepared

Driveway, Path and Slab Work

Driveways

The full drive, from digging out the old one to the finished surface. Block paving, concrete, tarmac or resin, sized and built for the vehicles that will park on it.

Paths and steps

Garden paths, side returns, bin routes and the steps between levels. Width, grip and a firm edge matter more here than the material does, especially on anything used in the dark or in the wet.

Slabs and bases

Concrete for something to stand on. A garage floor, a garden room base, a hot tub pad or a plinth for plant, poured to a thickness and reinforcement that suits the weight going on it.

On site

How a Driveway or Slab Job Runs

The same five stages every time, with the programme written down before anybody starts digging.

Book a site visit
  1. Stage one

    Site visit and survey

    We come out and look at the ground, the power, the drainage, the traffic and the risk, and take measurements on site instead of guessing from a photograph.

  2. Stage two

    Design and written quote

    A drawing and an itemised quotation naming the exact equipment, so you can compare it like for like with anyone else you have asked.

  3. Stage three

    Civils and groundworks

    Excavation, drainage, ducting and foundations, carried out by our own team to the programme we agreed.

  4. Stage four

    Installation and commissioning

    Fit, wire, set the force limits, prove the safety devices and test the whole system before anybody signs it off.

  5. Stage five

    Handover and aftercare

    The paperwork, and a walkthrough for whoever uses it every day.

Common questions

Questions About Driveways and Slabs

Do I need planning permission to pave my front garden

In England the general position is that paving more than five square metres of a front garden with a surface water cannot pass through normally needs permission. Use a permeable surface, or direct the water to a border, a lawn or a soakaway on your own land, and it usually does not. Check yours with the council.

Can you sort out a dropped kerb

A dropped kerb, or crossover, is normally approved by the local highway authority, which is usually your council. No contractor can issue that permission. We can talk you through what the application involves, what they tend to look at, and build the drive so it lines up with the crossing when it is granted.

Which is better, block paving or concrete

It depends on what you want from it. Block paving can be lifted and relaid over a service, and a damaged block can be swapped. Concrete is one piece, so it takes heavy weight well but cannot be opened up neatly. On a drive with a service run underneath, that difference matters.

Can you lay a new surface over the existing driveway

Sometimes, but it is rarely the right call. Laying over a failed base hides the problem instead of fixing it, and it raises the level, which can put the surface above a damp course or a doorstep. We will tell you whether the existing base is worth keeping.

How thick does a slab for a hot tub need to be

Thicker than a shed base. It comes down to the filled weight, the ground underneath and whether anything is fixed to it, so it is worked out for your tub rather than picked off a chart. Get the answer before the tub arrives, because a slab cannot be thickened once it is poured.

A pair of black automated metal gates closed across the entrance to an apartment development, with a pedestrian gate beside them

Tell us about the site and we will tell you what it needs

Send a photograph and a postcode and we will come back to you with what the site needs.

Automated gates•Rising bollards•Groundworks in house•Utilities and drainage•GPR surveys•Tarmac and resin•London and the Home Counties•